June 28, 2021, started the 1 273 day period in which istrat-projects.in had 4 availability tests performed. Out of all tests attempted, istrat-projects.in was working 2 times, with the last instance on June 28, 2021, replying with a 200 status code. Analyses showed that istrat-projects.in was down 50.00% of the times evaluated, which equals 2 instances, most recently on March 26, 2023. The status of every response received has been confirmed error-free as of December 23, 2024. Istrat-projects.in's — seconds response time on March 26, 2023, contrasted its average of 0.229 seconds.